Saltar al contenido
APA Images

Vista previa con marca de agua. El archivo con licencia se entrega en su calidad completa y sin marca de agua.

Vista previa: primeros 60 segundos — archivo completo 10:41.

Lista de planos

APAwire - APAwire CLIENTS ONLY, Khan Younis, southern Gaza Strip, September 22, 2026. A sewage collection pump stands idle after operations stopped due to shortages of fuel, lubricants and spare parts, while the municipality has reduced water-pumping services to residents.

Declaraciones

  1. 0.1 SOUNDBITE (in Arabic) Ali Arbie, Sewage Pump Technician
  2. 0.2 SOUNDBITE (in Arabic) Alaa al-Din al-Batta, Mayor of Khan Younis
Pie de foto completo

RESTRICTION SUMMARY: APAwire CLIENTS ONLY SHOTLIST: APAwire - APAwire CLIENTS ONLY, Khan Younis, southern Gaza Strip, September 22, 2026. A sewage collection pump stands idle after operations stopped due to shortages of fuel, lubricants and spare parts, while the municipality has reduced water-pumping services to residents. SOUNDBITES: 0.1 SOUNDBITE (in Arabic) Ali Arbie, Sewage Pump Technician 0.2 SOUNDBITE (in Arabic) Alaa al-Din al-Batta, Mayor of Khan Younis STORYLINE: A sewage collection pump stood idle in Khan Younis, southern Gaza Strip, on September 22, 2026, after operations stopped due to shortages of fuel, lubricants and spare parts. The municipality has also reduced water-pumping services to residents, raising concerns over worsening pollution and the risk of disease outbreaks.

Pie de foto original entregado por el periodista, sin editar.

Detalles

Crédito
© APA Images
Referencia APA
APA-VD-2026-000288
Duración
10:41
Fecha

Restricciones

Solo para uso editorial. No se permiten cambios más allá del recorte y la corrección de color habituales.

Derechos de autor: © APA Images

Ver carrito ()